E46-430 · Commissioning & Run-In · Rotating equipment commissioning · ★★★
The unit was started before the commissioning personnel had left the rotating area; a corner of clothing was caught by the coupling, causing personal injury.
[Mechanism] Rotating parts are exposed and personnel can stray into the danger zone because physical isolation is lacking.
[Calculation] At 1500 rpm the surface speed exceeds 10 m/s and the pull-in force is large.
[Design gap] No guard and no interlocked stop were provided.
① Fit guards: fit guards over the exposed rotating parts before commissioning
② Interlocked stop: interlock the guard door with start-up so that opening it stops the unit
③ Clear the area: confirm no one is in the danger zone before starting
④ Emergency stop: a reachable emergency stop works and is pressed at once on any abnormality
⑤ Warnings: provide rotating-equipment warnings and work permits
⑥ Supervision: assign a watcher and a single commander
⑦ Quality verification: confirm safety by guarding and interlocks, confirmed by data
⑧ Standardize process: write isolation and guarding into the safety briefing, controlling at the source
GB/T 8196-2018 Safety of machinery - Guards - General requirements for the design and construction of fixed and movable guards