E46-459 · Dimension Chain & Tolerance Coordination · Pump body · ★★
A 4-link pump-body dimension chain used the extreme-value method to allocate IT7 to each link, but the assembled clearance measured out of tolerance by 0.09 mm, and the impeller hit the casing.
[Mechanism] In batch production the link sizes follow a normal distribution, so the extreme-value method is overly conservative and single parts can hardly conform.
[Calculation] Extreme-value T0=4×0.021=0.084 mm; statistical method T0=√(4×0.021²)=0.042 mm.
[Design gap] The statistical method was not chosen per batch characteristics to relax the individual links.
① Choose method: use the statistical method to allocate tolerances for batch production, controlling at the source
② Calculate chain: compute the closing link T0=√ΣTi² from statistical characteristics, confirmed by data
③ Relax links: individual-link tolerances may be relaxed to the statistical limit, detecting problems early
④ Measure and sort: measure and group at incoming inspection for assembly, preventing extreme-value waste
⑤ Control capability: use SPC to keep process capability CPK≥1.33, ensuring stability
⑥ Verify clearance: assembled measured clearance ≥0.05 mm, correcting early
⑦ Quality verification: confirm no casing contact by measured clearance, confirmed by data
⑧ Standardize process: write the tolerance-method selection into the design criteria, controlling at the source
GB/T 5847-2004 Dimensional chain — Calculation method