The state of non-standard design: every project feels like the first. The customer gives capacity and accuracy requirements, you draw the scheme from scratch, select the motor from scratch, check the chain from scratch — then find out a competitor had a mature structure five years ago with leaner parameters.
This is where a case library should help. But a case library is not for copying drawings — the dimensions will not match your duty, and copying guarantees errors. What is truly reusable is itscalculation skeleton: which to calculate first, which next, which numbers are the decision values, and which are verification values.
Below we walk through an accumulating-chain assembly line, then expand on how the case library is organized and the four-step reuse method.
An electronics assembly line requires 180 units/h, 25 stations, 800 mm fixture-plate pitch, 5 kg per workpiece and 6 kg per fixture plate. The chain is estimated as double-strand, 20 m long. Find chain speed, drive power, reduction ratio, and check chain tension and stop-impact.
T = 3600 / N = 3600 / 180 = 20 s/piece
These 20 seconds are not one station's work time — they are the whole line's total budget: pick, assemble, inspect, release, all inside it. Fix this cell at the scheme stage; every downstream speed is derived from it. Change the capacity requirement and this cell changes, forcing a full-line recalculation.
Station changes consume part of the cycle — take 30%, i.e. 6 s. This ratio is called the cycle utilization in the case library; assembly lines usually take 0.25–0.35, inspection lines up to 0.4.
That is 8 meters per minute. Note the 0.30 in the denominator: forget it and the speed becomes 2.4 m/min, the whole line runs over three times slower and never meets capacity.
On an accumulating chain the fixture-plate speed is twice the chain speed, set by the large/small roller diameter ratio (2:1), not by spinning the motor faster.
This is the easiest step to get wrong. Treating the plate speed directly as chain speed when sizing the motor doubles the calculated power (140 W here instead of 70 W), halves the reduction ratio, makes the chain run wild, and throws the fixture plate off.
Total moving mass: 26 fixture plates × 11 kg = 286 kg; double-strand chain 2 × 20 m × 2.5 kg/m = 100 kg; total 386 kg(plate count taken as stations +1, since one occupies each end).
Friction resistance (rollers on rail, μ = 0.08): F_fric = 0.08 × 386 × 9.81 = 302.9 N
Start-up inertia force (acceleration 0.3 m/s²): F_inertia = 386 × 0.3 = 115.8 N
Bend, lift, and stop sections add a 1.25 factor: F = (302.9 + 115.8) × 1.25 = 523.4 N
No component can be omitted. Friction only stalls at start; friction + inertia alone drops speed through bends.
Apply a 1.5 safety factor: 69.8 W. Then the problem: there is no 70 W gearmotor rating; the smallest standard is 0.4 kW. So we end up with 0.4 kW, a 5.7× margin.
This is not a mistake — it is engineering reality. Motor power is almost never the bottleneck on low-power transport lines; a 5×+ margin is normal. The real bottleneck is chain tension and positioning accuracy, which we check next.
Choose a 19-tooth sprocket, pitch 38.1 mm:
Chain speed 4.0 m/min gives output speed: n = v / (πD) = 4.0 / (π × 0.2315) = 5.50 r/min
A 4-pole motor runs 1440 r/min, needing ratio i = 1440 / 5.50 = 262. The nearest standard cycloidal ratio not less than it is 253, giving actual chain speed 4.14 m/min and plate speed 8.28 m/min — 3.5% faster than required, acceptable.
If you instead chose 187, chain speed would hit 5.6 m/min, plate 11.2 m/min, transport time shrinks to 4.3 s — cycle has slack, but stopper impact and positioning accuracy both worsen.
Split over two strands, single-strand tension F_chain = 523.4 / 2 = 262 N. The 08B accumulating chain has ~2700 N allowable tension, safety factor 10.3×, passed.
Stop impact: the plate hits the stopper at 0.133 m/s with a 10 mm buffer stroke; deceleration a = v²/(2s) = 0.89 m/s², impact force F = 11 × 0.89 = 9.8 N. Small, but positioning accuracy hinges on this — too stiff a buffer and the plate rebounds 1–2 mm, and the assembly robot grips off.
A case library's value is not in 'how many' but in 'which fields each case stores'. Baishi Technical Manual's library fixes eight fields per case; miss one and it becomes useless:
| Field | What it stores | Example (this case) | What happens if missing |
|---|---|---|---|
| Case name | Equipment name + key structure | Accumulating-chain conveyor line | Cannot search it = as good as not stored |
| Equipment type | One of 13 categories | Conveyor line | Cannot filter by category |
| Category | Whole-machine parameters / component parameters | Whole-machine parameters | Do not know which level you can change |
| Design parameters | Capability boundaries (speed/load/accuracy/size) | 2–20 m/min, 30 kg/station | Do not know if it fits |
| Key calculations | The decisive 2–3 formulas | v_plate=v_chain×2; P=Fv/η | Can only copy drawings, cannot modify |
| Design key points | The few things the structure must achieve | Stopper + check, positioning ±0.5 | Computed right but cannot build it |
| Precautions | The boundary conditions most likely to trip you up | Chain tension moderate, lubrication adequate | Find out it cannot be changed only after assembly |
| Schematic description | Drive chain / motion sequence in one line | Drive → accumulating chain → fixture plate → stop | Assembly sequence must be rethought |
Baishi Technical Manual currently holds 101 casestypical design cases, covering 13 equipment types. The distribution itself is a signal — which type is built repeatedly shows where the non-standard industry's main battleground is:
| Equipment type | Number of cases | Equipment type | Number of cases |
|---|---|---|---|
| Non-standard automation dedicated machines | 12 | Fixtures and jigs | 8 |
| Automated assembly equipment | 10 | Inspection equipment | 8 |
| Machining equipment | 10 | Packaging equipment | 8 |
| Conveyor line | 8 | Hydraulic system | 8 |
| Labeling machine | 6 | Pneumatic system | 6 |
| Welding machine | 6 | Handling equipment | 6 |
| Coating / surface treatment | 5 | Total | 101 |
Do not search by name. Searching 'accumulating chain' only finds same-named cases, but your need may be 'fixture plate must stop at 25 stations, 20 s each' — then search the three conveyor types (accumulating, slat, roller), compare speed, load, and positioning accuracy, and pick the one whose capability covers yours.
The skeleton is the order 'compute cycle first → then speed → then force → then power → finally verify'. Wrong order wastes everything: those who size the motor first are forever revising the scheme.
Across similar cases, usually only three quantities truly change: capacity (cycle), unit weight (traction), and accuracy (positioning method). Other parameters follow these three. Here, raising capacity from 180 to 240 drops the cycle to 15 s, plate speed to 10.7 m/min, chain speed 5.3 m/min, power still under 100 W — the conclusion: the motor is never the bottleneck on this line.
After computing, ask four questions: is the chain-tension safety factor enough (usually ≥8 for conveyors), will stop impact cause rebound, how much did the chosen ratio speed deviate, and will the motor overload at start-up acceleration. This example passes all four, but with 3.5% speed deviation — 'usable, but correct the cycle in the program using the actual chain speed'.
Parameter description:
| Symbol | Meaning | Unit | Value notes |
|---|---|---|---|
| T | Takt | s/piece | Back-calculated from capacity; the whole-line total budget |
| P | Station pitch (fixture-plate center distance) | m | Plate length + gap, gap ≥100 mm |
| k_conv | Takt utilization | — | Assembly 0.25–0.35, inspection 0.35–0.45 |
| i_ratio | Accumulating ratio | — | 2.0 common, 2.5 for heavy loads |
| m | Total moving mass | kg | Workpiece + fixture plate + chain; plate count = stations + 1 |
| μ | Friction coefficient | — | Take by rail type, see table below |
| a | Start-up acceleration | m/s² | 0.2–0.5, smaller for precision positioning |
| k_bend | Bend/lift additional factor | — | Straight 1.0, with bends 1.2–1.3 |
| η | Total transmission efficiency | — | Reducer + chain, 0.70–0.80 |
| K_A | Power safety factor | — | Conveyor line 1.3–1.6 |
| Type | Friction coefficient μ | Speed range | Single-point load | Positioning accuracy |
|---|---|---|---|---|
| Accumulating chain (rollers on rail) | 0.06~0.10 | 2~20 m/min | ≤30 kg/station | ±0.5 mm (with stopper) |
| Slat chain (slat on rail) | 0.12~0.20 | 1~15 m/min | ≤100 kg/m | ±1.0 mm |
| Belt line (PVC/rubber) | 0.02–0.04 (internal friction) | 0.5~30 m/min | ≤50 kg/m | ±2.0 mm |
| Roller line (gravity, 2–5° incline) | 0.03~0.05 | 5~60 m/min | ≤30 kg/unit | ±1.5 mm |
| Overhead chain (I-beam track) | 0.05~0.08 | 0.5~10 m/min | ≤50 kg/holder | ±2.0 mm |
| Metal rail slider (fixture plate direct push) | 0.12~0.18 | By air cylinder / electric cylinder | ≤50 kg | ±0.05 mm |
| Line type | k_conv | Notes |
|---|---|---|
| Manual assembly line | 0.25~0.30 | Manual pick/place is slow; allow enough transport time |
| Semi-automatic assembly line | 0.30~0.35 | Value used in this example |
| Fully automatic assembly line | 0.20~0.28 | Mechanism acts fast but positioning takes long |
| Inspection/test line | 0.35~0.45 | Inspection dominates, transport share is small |
| Buffer/transport section (no work) | 0.80~0.95 | Pure transport, almost all time spent moving |
| Transmission type | η | K_A | Remarks |
|---|---|---|---|
| Cycloidal reducer + chain | 0.75~0.85 | 1.3~1.5 | This example uses 0.75 |
| Worm-gear reducer + chain | 0.55~0.70 | 1.5~1.8 | Low efficiency, check heating |
| Helical-gear reducer + chain | 0.85~0.92 | 1.3~1.4 | First choice for high-power lines |
| Timing belt + linear guide | 0.85~0.90 | 1.4~1.6 | High precision, high cost |
| Chain specification | Pitch | Allowable tension | Recommended safety factor |
|---|---|---|---|
| 08B accumulating chain (C212A) | 38.1 mm | ≈2700 N | ≥8 |
| 12A accumulating chain | 38.1 mm | ≈4400 N | ≥8 |
| 16A roller chain (double strand) | 25.4 mm | ≈11000 N | ≥7 |
| 20A roller chain (double strand) | 31.75 mm | ≈17000 N | ≥7 |
| Wrong practice | Consequence | Correct approach |
|---|---|---|
| Using fixture-plate speed directly as chain speed when sizing the motor | In this example power computes to 140 W (2×), reduction ratio halves, fixture plate easily thrown off | Accumulating chain must divide by the speed ratio 2 (or 2.5) |
| Copying the 0.08 friction coefficient straight from the case library | Switch to a dry-friction steel rail (μ=0.15) and traction rises from 523 N to 855 N, power doubles to 114 W | Verify rail type and lubrication first, then set μ |
| Using 100% cycle utilization with no transport time reserved | Speed computed 3× too small; actual capacity never reaches the design value | Deduct by k_transport 0.25–0.35 |
| Taking the fixture-plate count equal to the station count | Under-counting one plate + one workpiece, traction 4% low | Take stations + 1, one at each end |
| Counting only friction, not start-up inertia and bends | Stalls at start, drops speed through bends, VFD over-current alarm | Count all three; multiply bends by 1.2–1.3 |
| Looking for a 70 W motor once power computes to 70 W | No such standard rating exists; scheme revised repeatedly | Drop straight to the smallest standard size, 0.4 kW, accepting a large margin |
| Checking only power, not chain tension | Power is enough, but the chain breaks at a bend or tensioner | Compare single-strand tension with the allowable value; safety factor ≥8 |
| Picking a stopper at random, ignoring the buffer stroke | Rebound 1–2 mm, robot grips off, positioning accuracy unachievable | Compute impact by v²/(2s) and choose an adjustable buffer |
Back to this example: cycle 20 s, fixture plate 8 m/min, chain speed 4 m/min, traction 523 N, actual 0.4 kW gearmotor with 253 ratio, single-strand tension safety factor 10.3, stop impact 9.8 N. A line's scheme really comes down to these seven numbers; the remaining structural details are already documented in the case library with methods and pitfalls.