E41-505 · Ball Screw Selection · Vertical Ball Screw Stick-Slip · ★★★★
A vertically installed ball screw (Z-axis) exhibited stick-slip at low speed (0.1m/min): the motion was discontinuous and the positioning accuracy was ±0.02mm against a requirement of ±0.005mm.
The verticality deviation of the ball screw installation was 0.03mm/500mm, so the nut experiences a side force while moving on the screw, F_side=F_axial×sinθ=5000×0.03/500≈0.3N. The friction force of the linear guide is F_fric=μ×W=0.005×5000=25N (friction coefficient μ=0.005, the vertical guide carrying load W=5000N). A side force of 0.3N is very small relative to the 25N friction force and does not directly cause stick-slip. The actual cause of the stick-slip: when the nut runs on the tilted screw the load on the balls in the nut raceway is uneven, some balls are unloaded (load 0) and others overloaded. An unloaded ball cannot carry load immediately on entering the loaded zone, which produces a small displacement that compensates the clearance and shows up as low-speed stick-slip. The elastic deflection of the ball screw (its own torsion) and the nut clearance alternately produce an accumulate-and-release stick-slip cycle.
1) Verticality requirement for a vertically installed ball screw: ≤0.01mm/500mm (check with a dial indicator on a magnetic base);
2) After installation, run a low-speed trial (0.1m/min) and check for stick-slip;
3) Increase the ball screw nut preload (from 500N to 1000N to remove the clearance);
4) Increase the stiffness of the transmission system (shorten the ball screw / increase the screw diameter);
5) Enable friction compensation in the servo system (the drive automatically compensates the drive force for friction).
FT_11_Ball Screw Selection