E41-504 · Ball Screw Selection · High-Speed Machining Center Ball Screw Bearing Cooling Blockage · ★★★★
On a high-speed machining center the ball temperature at the fixed-end bearing housing of the Z-axis (fitted with a cooling water jacket) rose to 75℃ after 2h of running (normal ≤45℃). The cooling water flow dropped from 5L/min to 0.5L/min.
The cooling circuit of the housing water jacket (bore Φ4mm, length 2m) accumulated scale over long-term use (CaCO₃, thickness about 0.5mm), reducing the effective bore from Φ4mm to Φ3mm. The water flow fell from 5L/min to 0.5L/min (a 90% reduction) and the cooling capacity became P_cool=ρ×Q×c×ΔT=1000×0.0000083×4180×10≈347W. The bearing heat generation is P_loss≈500W; with only 347W being removed the bearing temperature rose to 75℃. The high temperature accelerates grease oxidation (grease life about 1000h at 75℃ versus about 3000h at 60℃). After 3 months of high-temperature running the grease had turned to a dry state, the raceways wore, and the axial positioning accuracy degraded from 0.002mm to 0.008mm.
1) Use softened water for cooling (hardness ≤50mg/L to reduce scale);
2) Descale the cooling circuit at regular intervals (circulate a 5% citric acid solution for 30min every 6 months);
3) Fit a cooling water flow switch (alarm when flow <2L/min);
4) Provide a cleaning port on the cooling water jacket (for mechanical clearing of the circuit);
5) Use a closed-loop cooling circuit (coolant + plate heat exchanger, entirely free of scale).
FT_11_Ball Screw Selection