E41-304 · Other Selection · Cooling Tower Fill Clogging · ★★★
The cooling-tower circulating water temperature rose from the design value of 35℃ to 42℃, and equipment cooling was insufficient. Inspection found the fill layer was about 60% clogged with sludge and algae.
After long-term circulating-water service (2 years), the cooling-tower fill (PVC corrugated sheets, specific surface area 150m²/m³) became coated with sludge and algae. Suspended solids (SS) in the circulating water at about 50mg/L deposited on the fill surface, and the water temperature of 30~40℃ promoted algae growth (green algae + blue-green algae). The mixed sludge-algae layer was about 2~3mm thick, reducing the fill's specific surface area from 150 to 60m²/m³ (a 60% reduction). The cooling capacity of the tower is P_cool=K×A×ΔT=100×60×10=60kW (K is the heat-transfer coefficient, A the effective area, ΔT the temperature difference). Against a design cooling capacity of 120kW (A=120m²), the actual value was only 60kW, and the circulating water temperature rose from 35℃ to 42℃.
① Keep suspended solids in the cooling-tower circulating water ≤20mg/L (install a filter)\n② Install an algae-control device on the cooling tower (UV sterilization or corrosion/scale inhibitors)\n③ Clean the fill periodically (once a year, with a high-pressure water jet)\n④ Change the fill material: PVC→polypropylene (PP, with a smoother surface that resists adhesion)\n⑤ Or switch to a cross-flow cooling tower (easier to clean and maintain)
FT_Machine Design Handbook