E41-314 · Other Selection · Outdoor Cable Tray · ★★★
During the rainy season the outdoor cable tray accumulated a large amount of water; the cable was submerged for a long time and the insulation resistance dropped from 1000MΩ to 2MΩ. The bottom of the tray had rusted through.
The cable tray was installed horizontally (slope 0%) without a drainage slope (standard ≥0.5%). The tray is 20m long overall, with no drain holes and a well-sealed cover (IP43). During the rainy season, water first accumulated on the tray bottom, to a depth of about 20mm, fully submerging the cable. After long-term immersion, the cable sheath (PVC) absorbed water that permeated inward, and the water-tree effect accelerated insulation degradation. The tray is made of hot-dip galvanized steel sheet (zinc coating 80μm); in a submerged environment the zinc coating corrodes at about 0.5μm/month, so after 8 months the coating was nearly consumed and the steel began to rust. After 2 years the tray bottom rusted through (Φ5mm holes), leaving the cable exposed to rainwater.
① Install outdoor cable trays with a slope ≥0.5% (drill Φ10mm drain holes at the lowest point, spaced 3m apart)\n② Punch drain holes in the tray bottom (spaced 2m apart, to prevent water accumulation)\n③ Use stainless-steel trays (304, corrosion-resistant) or aluminum-alloy trays\n④ Select a waterproof cable (PE sheath + waterproof tape sealing)\n⑤ Add a rain hood to the tray (cover overlap length ≥50mm)
FT_Machine Design Handbook