Knowledge Base › Selection Error Cases › Fracture of the bolts connecting the gear ring to the hub (large gear composite structure)

Fracture of the bolts connecting the gear ring to the hub (large gear composite structure)

E41-626 · Gear Transmission Selection · Large Gear Composite Structure · ★★★★★

Problem Description

After 1 year of operation, 2 of the bolts (M30×120 mm, grade 12.9, 12 bolts) connecting the large gear ring (split in two halves, bolted together) to the hub had fractured and the rest had loosened.

Root Cause

The large gear (m=25 mm, outer diameter Φ4500 mm) uses a split structure (two half gear rings + hub), with M30 connecting bolts (grade 12.9, preload F_v=0.6×σ_s×A_s=0.6×1080×561=363 kN). The total preload of the 12 bolts is 4.36 MN. The transmitted torque T=9550×800/12=637 kNm, and the shear force on the bolts F_s=T/r=637000/1.8≈354 kN (bolt circle radius 1.8 m). The shear force on a single bolt is 29.5 kN, far less than the bolt's shear strength (about 500 kN). However, under the preload of 363 kN the bolts developed a tensile stress σ_t=363000/561=647 MPa; adding the bending stress (an additional bending moment σ_b=6M/πd³=6×363000×0.0003/(3.14×0.03³)≈77 MPa produced by a 0.3 mm perpendicularity deviation of the bolt holes), the total stress is 724 MPa. The fatigue limit of a grade 12.9 bolt is about 700 MPa (10⁷ cycles); 724 MPa >700 MPa, so the bolts fractured by fatigue under alternating load. The stress amplitude is the key to the problem: fluctuations in the working load varied the bolt stress between 647 and 724 MPa, giving a stress amplitude Δσ=77 MPa, far higher than the fatigue-limit stress amplitude of a grade 12.9 bolt (about 50 MPa@10⁷ cycles).

Corrective Solution

① Fatigue-strength checking of a bolted connection should use the stress amplitude rather than the maximum stress\n② Increase the number of bolts (12 → 16) to reduce the stress amplitude of each bolt\n③ Ream the bolt holes (H7 accuracy) to eliminate the clearance between bolt and hole (switch to reamed-hole bolts to carry the shear)\n④ Increase the bolt diameter (M30 → M36) and reduce the preload to 60% of the yield strength (to lower the stress level)\n⑤ Use the torque-plus-angle method when installing the bolts (to control the preload precisely, with a deviation ≤±5%)

Checklist

Reference

FT_Gear Transmission Design

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL