E41-704 · Pneumatic Component Selection · Insufficient Directional Valve Flow · ★★★
Cylinder extension time was 2.5 s (requirement ≤1 s).
Tubing Φ6 mm, 8 m long with large volume, fittings necked to Φ4 mm; actual Cv dropped from 0.8 to 0.25.
① Directional valve Cv must satisfy the flow required by the cylinder
② Match tubing port size to the directional valve
③ Fittings without necking
FT_Hydraulic & Pneumatic Design