E41-715 · Pneumatic Component Selection · Air Pipe Condensate · ★★★
In winter, downstream pneumatic components accumulated large amounts of water and rusted.
The main pipe was laid horizontally without slope; condensate accumulated at low points and was carried into equipment by airflow.
① Give the main pipe a 1:100 drainage slope toward the end
② Install automatic drain valves at the lowest points
③ Take branch lines from the top of the main pipe
FT_Hydraulic & Pneumatic Design