E42-059 · Fatigue Fracture · Crane Main Girder Box Girder · ★★★
Cracks appeared at the weld toe of the main girder web, the crane had to be derated
[Toe Stress Concentration] With a weld toe angle θ=135° and a reinforcement height of 1.5mm, the stress concentration Kt≈2.5; a pulsating load σ=120MPa gives a local σ_max=300MPa.
[Fatigue Crack Initiation] The welding residual tensile stress superimposes on Kt, and on the S-N curve at 300MPa the life is only 1e6 cycles, so the crack appeared after 2 years of use.
[Design Omission] The weld toe was not ground to R2 and no magnetic-particle inspection was performed, so the main girder had to be derated.
1) Grind the weld toe to at least R2;
2) Apply post-weld heat treatment to the main girder to relieve stress;
3) Perform 100% magnetic-particle inspection;
4) Re-check the load capacity and apply a derating;
5) Use UT plus MT on critical welds;
6) Thicken the web for reinforcement;
7) Monitor the operating load;
8) Include weld toe treatment in the welding procedure.
GB/T 3811-2008 Code for Design of Cranes