MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Structural Design Error Case Study › Press Connecting Rod Bolt Fracture

Press Connecting Rod Bolt Fracture

E42-509 · Fatigue Fracture · Hot Die Forging Press (1600t) · ★★★

Problem Description

Connecting rod bolt M48; insufficient preload σa=180MPa; fractures at 5×10^5 cycles; 2 shutdowns per month

Root Cause

[Bolt Fatigue] σa=180MPa; thread stress concentration Kt=3; Goodman n=0.95<1.
[Low Preload] Insufficient torque; no anti-loosening.
[Design Omission] No bolt fatigue check; torque not controlled; safety factor 1.0 (should be ≥1.5).

Corrective Solution

1) Change bolt to fine thread M48×3;
2) Control torque to ±5%;
3) Add anti-loosening nylon insert;
4) Check loosening each shift;
5) Limit tonnage to ≤1500;
6) Flaw detect bolt;
7) Upgrade strength to grade 10.9;
8) Periodic preload recheck.

Checklist

Reference

GB/T 3098.1-2010

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL