E42-170 · Threaded Fastener Loosening · Reactor Flange M27 Bolt · ★★
After heating, bolt preload drops 50% and the seal leaks.
[High Friction] Unlubricated thread friction coefficient μ=0.2; actual preload only 50% of design. [Decay] Thermal cycling makes preload repeatedly fluctuate and decay. [Design Omission] No molybdenum disulfide, μ not controlled; leakage.
1. Apply molybdenum disulfide to the thread pair to lower μ to 0.12.
2. Calculate preload torque from measured μ.
3. Add spiral-wound gaskets to the flange for compression.
4. Hot retighten after heating.
5. Add sleeves to bolts for uniform temperature.
6. Control sealing-face roughness to Ra1.6.
7. Pressure-hold leak detection.
8. Spot-check the flange each shift for leaks.
GB/T 16823.2-1997