E42-031 · Impact & Overload Fracture · Conveyor Line Reduction Shaft · ★★★
The shaft snapped in torsion at the instant of emergency stop, production stopped
[Impact Torque] With an emergency-stop angular deceleration β=50rad/s² and an inertia J=4kg·m², the torque T=Jβ=200N·m; applying a dynamic load factor of 5 gives a peak of 1000N·m.
[Strength Check] With d=30 and a torsional section modulus Wt=πd³/16=5300mm³, the shear stress is τ=T/Wt=1000/5300=189MPa, above the allowable [τ]=120.
[Design Omission] No buffering was fitted and the impact was not calculated, so the shaft snapped and production stopped.
1) Add a fluid coupling to absorb the impact;
2) Design the shaft diameter for the peak torque;
3) Increase the shaft diameter to d=40;
4) Limit the deceleration to ≤20rad/s²;
5) Provide overload protection;
6) Carry out impact and fatigue check calculations;
7) Run a bench impact test;
8) Include impact load in the drive shaft design inputs.
GB/T 10095 Gear Accuracy