E42-319 · Structural Instability and Buckling · Press column · ★★
Four-column press column (M80 tie rod): slack buckled, crossbeam tilted; repaired twice a month
[Tie-rod buckling] Uneven preload, single column over-tensioned, buckled.
[Tilt] Crossbeam not level, accuracy lost.
[Design Omission] No preload control, no stability calculation; safety factor only 1.2.
1) Evenly distribute tie-rod preload (difference ≤5%);
2) Upsize tie rods to M100;
3) Provide preload monitoring;
4) Add guidance to crossbeam;
5) Parallelism check each shift;
6) Limit tonnage;
7) Periodic re-torque;
8) Deformation patrol.
JB/T 3766-2016