Excessive Plunger Clearance in a Metering Pump Causes Metering Error

E43-138 · Improper Clearance Fit · Dosing Metering Pump · ★★

Problem Symptom

The clearance between the Φ12 plunger and the bore was designed at 0.005mm but measured 0.02mm; the metering error reached 4%

Root Cause

[Large Clearance] The design clearance was 0.005mm, but bore wear made the actual clearance 0.02mm.
[Error] With the large clearance the backflow caused a metering error of 4%, above the 1% allowable.
[Design Omission] The clearance should have been lapped to ≤0.006mm with the accuracy verified, but wear was not controlled.

Correct Solution

1) Lap the clearance to ≤0.006mm;
2) Hone the bore to Ra0.2;
3) Chrome the plunger;
4) Carry out a metering accuracy test;
5) Verify the error against the leakage;
6) Replace parts regularly;
7) Keep the medium clean;
8) Spot-check every batch.

Checklist

References

GB/T 1801-2009 Limits and Fits