E43-486 · Dimensional-Chain Accumulation · Ship shafting designed length 20m±2, measured >12mm after multi-sections · ★★★
Multi-section shafting accumulation made coaxiality 12mm out of tolerance, causing bearing heating.
[Mechanism] Multi-section shafting installation chain accumulated, so the closed loop (coaxiality) went out of tolerance.
[Calculation] T0=ΣTi=6×2=12, 6× the 2 allowance.
[Design Omission] No adjustment or match-machining; design defect → coaxiality out of tolerance.
1) Provide an adjusting shim to absorb accumulation;
2) Match-machine each section per T0/√6;
› Milling Fixture Hole-Position Accumulation
4) Statistical check;
5) Selective matching by measurement;
6) Leave grinding stock;
7) Laser alignment check;
8) First-article coaxiality measured ≤2.