E43-496 · Dimensional-Chain Accumulation · Camshaft timing designed 0°±10′, measured ±50′ after 6 cams · ★★★
Multi-cam phase accumulation made valve timing 50′ out of tolerance, reducing power.
[Mechanism] Multi-cam phase dimensional chain accumulated, so the closed loop (phase) went out of tolerance.
[Calculation] T0=√(6×0.33²)=0.81°≈49′, 4.9× the 10′ allowance.
[Design Omission] No matched machining or unified datum; design defect → phase out of tolerance.
1) Provide matched keyways to absorb accumulation;
2) Match each cam per T0/√6;
3) Unify the datum;
4) Statistical check;
5) Selective matching by measurement;
6) Leave adjustment allowance;
7) Phase meter check;
8) First-article phase measured ≤10′.
GB/T 5847-2004 Dimensional chain — Calculation method