E44-989 · Vessel Strength and Wall-Thickness Deficiency · Manhole · ★★★
Weak manhole, cracking, leak
[Mechanism] The large manhole opening weakened the shell; the reinforcement area did not meet GB/T 150, and nozzle-zone stress concentration cracked.
[Calculation] Manhole DN500, opening diameter d=520mm, required reinforcement A≈12000mm², supplied only 7000mm², local σ=200MPa exceeds [σ].
[Design Omission] No opening-reinforcement calc, no ring added, and no stress check.
1) Recalculate manhole reinforcement per GB/T 150 (A need ≥12000mm², supply enough), since under-reinforcement concentrates stress and a correct check provides enough — thus lowering stress;
2) Check the reinforcement area (add integral reinforcing forging + ring), since a weak joint cracks and a ring reinforces it — thus reinforcing;
3) Add a reinforcement pad (δ=14mm, double-sided full weld), since a thin pad cracks and a thick one raises strength — thus reinforcing;
4) Switch to a thicker shell (δ=12mm, was 8mm), since a thin wall is weak and a thick one raises strength — thus raising strength;
5) Perform MT on the manhole zone (no cracks), since cracks first show as lines and can be rejected early — thus finding cracks;
6) Run a hydrotest (1.25× design pressure), since under-reinforcement caused cracking and measurement confirms stability — thus setting strength by data;
7) Control the number of openings (spacing ≥2d between adjacent holes), since close holes weaken and controlled spacing equalizes — thus laying out openings;
8) Write the reinforcement calc and check into the calculation book, since the inadequate-manhole root cause was the missed A calc and missing ring — thus locking it in at design.
GB/T 150.1-2011 Pressure vessels