E44-1014 · Insufficient Vessel Strength and Wall Thickness · Vessel · ★★★
No pressure test, leakage, hazard
[Mechanism] After fabrication, no GB/T 150 hydrostatic test was run, so defects and leaks were never exposed; the vessel leaked as soon as it went into service.
[Calculation] The required Pt=1.25×1.6=2.0MPa hold for 30min was never performed; at service pressure 1.4MPa the welds already seeped.
[Design Omission] No hydrostatic test, no pressure verification, and no leak detection.
1) Make up the hydrostatic test (Pt=1.25×1.6=2.0MPa held for 30min); skipping the test caused service leakage, and a proper test exposes it;
2) Verify the test pressure (1.25× design pressure, no discount); taking a low test pressure lets leaks pass, verified pressure keeps it compliant;
3) Raise the test-pressure ratio and hold (to catch micro-seepage); a short hold shows nothing, a steady hold reveals micro-leaks;
4) After the hold, check for leaks (soapy solution on every weld); micro-leaks first show as seepage, and early repair confirms no leak;
5) 100% visual inspection plus 20% radiography of welds (covering the weak spot); un-inspected defects stay hidden, and inspection exposes them;
6) Record and archive the pressure–time curve; no test leaves no evidence, and archiving makes it traceable;
7) Control the pressurization rate ≤0.3MPa/min (slow rise to stabilize the part); a fast rise damages an unstable part, and a slow one tests smoothly;
8) Record the proper test and pressure check in the process card; the root cause of the missing hydrostatic test was a skipped test and no leak detection, so the process must gate it.
GB/T 150.1-2011 Pressure vessels