E44-098 · Other · Overhead Process Piping · ★★
Long spans pushed deflection past the allowable limit; the flanges leaked under bending, and the pipe deformed at supports.
[Deflection] A long span makes deflection δ=5qL⁴/384EI exceed the limit, tilting the flanges.
[Calculation] Increasing the span makes δ∝L⁴ exceed the allowable, and the flanges leak under bending.
[Design Omission] Spans were not selected by deflection and supports/hangers were weak; sag caused leakage.
1) Back-calculate support/hanger spacing from the deflection limit δ≤L/200; δ=5qL⁴/384EI∝L⁴, so longer spans make deflection surge, thus limiting span keeps flanges free of extra bending moment;
2) Add intermediate supports/hangers to share the load; concentrated load superposes on the original span deflection, so lower per-span load and deflection;
3) Check deflection and hold δ≤L/200 (e.g., L=6m gives δ≤30mm); exceeding the limit tilts and bends the flanges into leakage, so set a quantified limit;
4) Provide spool pieces or expansion joints at flange joints; when the pipe sags the flanges must absorb displacement, compensating misalignment and cutting leakage;
5) Recheck support spacing by pipe diameter and wall thickness; small thin-walled pipe has low stiffness and sags, so set spacing by spec rather than experience;
6) Monitor mid-span deflection during hot operation; thermal elongation shifts support-reaction distribution, so catch abnormal sag early;
7) Measure mid-span deflection and flange leak-tightness on commissioning; design requirements need measured confirmation, so delivery has evidence;
8) Bring span and deflection into the support design calculation dossier; traceability is required, so later maintenance has a baseline.
GB/T 20801-2020 Pressure piping code