E44-1110 · Miscellaneous · Vent Valve · ★★
Blocked, pressurized, high pressure
[Mechanism] The vent valve is internally blocked and under-opened, so the system cannot vent properly and dangerous pressure builds during maintenance.
[Calculation] The valve is DN25; after blocking its effective size is DN10, and vent capacity falls from 0.5m³/min to 0.08, building pressure to 0.3MPa, above the maintenance limit.
[Design Omission] No full bore, no flushing provision, no valve-type check, and no vent test performed.
1) Specify a full bore ≥DN40 (replacing DN25), since the small size caused blockage and a large enough bore vents freely, restoring venting;
2) Add a flushing blowout (blow through before maintenance), since deposits cause blockage and flushing clears it, restoring venting;
3) Select a block-resistant vent valve type, since a plain one clogs while a suitable valve vents freely, fully venting the line;
4) Open it fully for venting, since a closed valve traps pressure while an open one vents, dropping the pressure;
5) Run a vent test (venting ≥0.5m³/min), since without proof venting is unknown and a measured flow confirms it, sizing venting on data;
6) Fit pressure monitoring (alarm on buildup), since blockage first shows as rising pressure for early warning, monitoring blockage;
7) Set a cleaning interval (monthly), since prolonged service causes blockage and scheduled cleaning prevents it, keeping it clear in service;
8) Write the bore and flushing into the vent drawing, since pressure buildup stems from no full bore plus blockage, closing the loop at the drawing.
GB/T 12238-2008 Valves