E44-351 · Excessive Piping Resistance and Pressure Drop · 800m straight run with no vent · ★★
Air binding at the high points of a long straight run shrinks the effective section, raises equivalent resistance 30%, and drops the end pressure 0.1MPa
[Mechanism] Air accumulates at the long run's high points, occupying the section and raising equivalent resistance.
[Calculation] The 30% rise in equivalent resistance drops the end pressure 0.1MPa.
[Design Omission] No sectional venting and no slope - the long run developed air resistance.
1) Fit air vents every ≤100m and lay on a slope, since air binding raised equivalent resistance 30% and dropped the end 0.1, venting in sections;
2) Add an air collector for centralized venting, since dispersed air is hard to vent, collecting air;
3) Check the air-bound equivalent resistance, since air binding causes loss, computing correctly;
4) Keep air out of the pump suction, since air causes cavitation, preventing air ingestion;
5) Periodically vent manually, since vents can fail, manual venting;
6) Monitor flow to catch the drop early, since binding cuts flow, monitoring flow;
7) Lay out high points for easy venting, since air collects at the top, siting vents high;
8) Write sectional venting into the design, since the missing vents were the root cause, closing the loop at design.
GB/T 20801.3-2020 Design code for industrial metallic piping