E44-1030 · Excessive Piping Resistance & Pressure Drop · Outlet · ★★
High back pressure, high resistance, pressure drop
[Mechanism] The discharge pipe is undersized and throttled by a globe valve, so the system resistance far exceeds the pump characteristic, the operating point shifts left and the flow is short.
[Calculation] Design Q=200m3/h, DN150 pipe at v=3.1m/s, friction lambda=0.025 over L=120m gives hf=lambda*L/d*v^2/2g=2.4m; 6 elbows and 1 globe valve give Sum_xi=9.7 and a local hf=1.95m, so total H_sys=4.35m, at which the pump delivers only Q=160m3/h, 20% below design.
[Design Omission] No hydraulic calculation of the line was made, the operating point was never verified, and the diameter was never enlarged.
1) Enlarge the discharge line to DN200 (v falls to 1.7m/s and hf drops 65%); the high velocity made the friction loss large and enlarging the pipe lowers it, restoring the design flow;
2) Verify the line operating point (recalculate H_sys and take the intersection with the pump Q-H curve, Q>=200m3/h); the original omission skewed the operating point, and checking the point reveals the margin and makes the flow meet the specification;
3) Replace the globe valve with a gate valve (xi 7 to 0.3, local hf from 1.4m down to 0.06m); the globe valve has a high local resistance and changing the valve lowers it, reducing the local losses;
4) Reduce the number of elbows (6 to 3, Sum_xi 9.7 to 5.2); the elbow local resistances accumulate and reducing their number lowers the total resistance;
5) Carry out a hydraulic test of the line (measured DeltaP within 10% of the calculation); the losses were miscounted and measurement confirms the flow, so the data fixes the resistance;
6) Fit a flow meter and an outlet pressure gauge (monitor Q and DeltaP); a change in resistance shows up first as a pressure drop, ahead of the flow shortfall, so the instruments give early warning;
7) Control the outlet valve opening at >=80% in operation (throttling increases the resistance); closing it down raises the resistance and controlling the opening keeps it steady, preventing resistance in operation;
8) Write the hydraulic calculation of the line into the calculation sheet; the root cause of the high back pressure was a missing line resistance verification with no diameter increase, so the calculation sheet closes the loop.
GB/T 20801.3-2020 Design Code for Industrial Metallic Piping