E44-302 · Valve Selection and Internal Leakage · Nuclear-grade globe valve J41H-N DN50 · ★★★
Without in-service inspection the internal leak rate exceeded the code limit, with abnormal primary make-up water — a safety hazard.
[Leak] Aged seals without inspection let the internal leak exceed code.
[Hazard] The leak caused abnormal make-up and reduced safety.
[Design Omission] No in-service inspection and testing per nuclear code, and no records kept — the nuclear valve leaked.
1) Set periodic in-service inspection and seal tests per nuclear safety code; without inspection the leak exceeded spec, made-up water abnormally, and posed a hazard, so inspect per code;
2) Build a valve life record to track it; aging changes over time, so make it traceable;
3) Add leak monitoring on critical valves; leaks are hard to notice, so monitor;
4) Replace seals by life; aging causes leaks, so replace on schedule;
5) Run nondestructive testing to find body defects; defects grow, so inspect them;
6) Provide redundant isolation valves; a single leaking valve is risky, so add redundancy;
7) Have certified personnel operate per procedure; people err, so require certification;
8) Bring in-service inspection into the quality system; the lack of inspection was the leak cause, so gate it by QA.
GB/T 30832-2014 Valves - Flow coefficient and flow resistance coefficient test methods