E44-015 · Water Hammer and Pressure Surge · Steam Condensate Line · ★★
Steam carrying water formed water hammer; the pipe vibrated violently at 5mm amplitude and two supports fell off.
[Water-Hammer Force] High-velocity steam pushes a pooled slug, producing a water-hammer force F=ρaAv of several kN.
[Drainage] An oversized or missing trap let pooled condensate at the pipe bottom be picked up.
[Design Omission] No drainage points and no sloped drainage — steam-water mixed flow caused the hammer.
1) Give the line a continuous slope (≥0.002) with low-point drains; the slope lets condensate flow to low points instead of pooling at the bottom and being picked up, so eliminate pooled water as a hammer source;
2) Size traps by capacity to prevent pooling; an oversized or missing trap lets condensate accumulate and the water-hammer force F=ρaAv reaches several kN, so drain condensate promptly;
3) On start-up, warm the pipe thoroughly and drain condensate before raising pressure; a cold pipe hit by sudden steam creates abrupt condensation that high-velocity steam pushes, so warm slowly and drain gradually;
4) Add supports and hangers densely and check them against the water-hammer force; several-kN hammer force knocked supports off, so densify and check capacity;
5) Add water-hammer bends and a sump; the bends absorb shock and the sump holds water, so weaken the hammer;
6) Add a steam-water separator on the dry main; separating out condensate reduces bottom pooling, lowering the hammer probability;
7) On commissioning, measure vibration amplitude ≤0.1mm (was 5mm); water hammer shows as severe vibration, so confirm by measurement;
8) Bring drainage layout into steam-pipe design; the missing drain points were the hammer root cause, so the design must include it.
GB/T 50746-2012 Petrochemical industry - Design code for steam piping