E44-014 · Water Hammer and Pressure Surge · Water Transmission Line Butterfly Valve · ★★★
A 6s fast butterfly-valve closure produced a 1.9MPa water-hammer pressure (normal 0.8), tearing the expansion joint and shutting off supply for 8h of repair.
[Direct Hammer] Ts=6s <Tc=2L/c=20s is direct hammer, Δp=ρcΔv.
[Reflected Shock] Pressure-wave reflection triples the force on elbows, and weak points rupture.
[Design Omission] The closing time was not controlled >2L/c and no relief valve was set — fast closing caused the hammer.
1) Control the closing time >2L/c (20s here) to avoid direct hammer; Ts=6s <Tc=20s is direct hammer with Δp=ρcΔv at its maximum, so stretching closure drops Δp sharply and turns it into indirect hammer;
2) Change the butterfly valve to a slow-closing type or add a slow-close mechanism; slow closing spreads the velocity-change rate over >2L/c, so slow the final closure to kill the hammer;
3) Fit a relief valve on the line to limit the hammer peak; should it still overpressure, it discharges to protect the pipe from rupture, so safety redundancy;
4) Select and strengthen the expansion joint for the hammer pressure (the original 1.9MPa); the expansion joint is the weak part and was selected for normal pressure, so raise its pressure rating;
5) Reinforce elbows and weak spots; pressure-wave reflection triples elbow force and they break first, so locally strengthen;
6) Run a closing water-hammer simulation to set the safe time; experience easily misses reflected superposition, so quantify and set the closure curve;
7) Set pressure-wave monitoring and alarm; water hammer is instantaneous and hard to notice, so alarm on anomaly;
8) Write the closure curve into the operating procedure; fast closing is the main human-error cause, so operate to a documented basis.
GB/T 50268-2008 Code for construction and acceptance of water supply and sewerage pipeline engineering