E44-381 · Water Hammer and Pressure Surge · Bladder-type arrester, burst bladder · ★★
A ruptured bladder connected the gas and water sides, defeating wave absorption; at pump shutdown Δp=1.4MPa exceeded the allowable limit and a nearby gasket leaked.
[Mechanism] The ruptured bladder lets gas migrate into the water, so it cannot absorb the wave.
[Calculation] Δp=1.4 exceeded the allowable limit and caused leakage.
[Design Omission] The bladder was not inspected and no spare was kept, so the burst bladder caused failure.
1) Replace the bladder and periodically check for leaks, because the rupture let gas migrate, Δp=1.4 exceeded the limit and leaked; hence new bladder restores absorption;
2) Provide a standby twin arrester, because a single tank rupture is risky; hence dual protection;
3) Check post-absorption Δp≤allowable, because the uncalculated value exceeded the limit; hence accurate calculation;
4) Up-rate the tank to prevent cracking, because of overpressure; hence higher rating;
5) Close first and then stop the pump, because a direct stop generates a large wave; hence close first;
6) Provide gas-water separation observation, because a rupture is hard to detect; hence monitoring;
7) Recheck by water-hammer simulation, because estimates fall short; hence simulation;
8) Put bladder maintenance into the procedures, because the lack of inspection was the root cause of rupture; hence procedural control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection