E44-402 · Water Hammer and Pressure Surge · Pump-Shutdown Cavitation + Hammer · ★★★
Pump shutdown creates a transient vacuum at the suction, causing cavitation accompanied by water hammer; Δp=1.2MPa exceeds the allowable limit, with cavitation pitting on the impeller plus a gasket leak.
[Negative-Wave Cavitation] The shutdown negative wave cavitates the suction and is accompanied by hammer.
[Leak] Δp=1.2 over the allowable limit leaked through the gasket.
[Design Omission] No suction-pressure maintenance and no hammer attenuation — cavitation and hammer arose together.
1) Maintain positive suction pressure before shutdown to prevent cavitation and attenuate the hammer; the negative wave caused pitting plus Δp=1.2 over the limit and leakage, so hold pressure and cut the hammer;
2) Add a slow-closing check valve to reduce the negative wave; fast shutdown generates vacuum, so close slowly;
3) Check suction NPSHa against cavitation; the negative wave caused cavitation, so verify NPSH;
4) Install a surge arrester to cut the peak, because the amplitude exceeds the limit; hence peak absorption;
5) Upgrade the pipe rating to prevent gasket leakage; over-limit pressure leaked, so raise the rating;
6) Specify cavitation-resistant impeller material; cavitation caused pitting, so use erosion-resistant material;
7) Recheck by water-hammer simulation, because estimates fall short; hence simulation;
8) Write pressure-holding and hammer attenuation into the design; the missing pressure maintenance was the root cause, so close the loop at design.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection