Unprotected Water Hammer on Pump Shutdown

E44-1039 · Water Hammer & Pressure Surge · Pump Discharge · ★★★

Problem Symptom

Water hammer on shutdown, vibration, cracking

Root Cause

[Mechanism] On shutdown the discharge check valve closes suddenly and the reversing water column in the pipe strikes, generating a pressure surge far above the static pressure.
[Calculation] With pipe L=300m, v=2.0m/s and a water hammer wave speed c=1000m/s, DeltaP=rho*c*Delta_v=1000x1000x2.0=2.0MPa, five times the 0.4MPa static pressure, and the valve components were not rated for it.
[Design Omission] No slow-closing check valve was fitted, the water hammer was never calculated and no buffer vessel was provided.

Correct Solution

1) Change to a slow-closing check valve (10s closing time instead of instantaneous); a sudden closure causes the hammer and slow closing shaves the peak, so the surge pressure falls;
2) Verify the closing time so that DeltaP<=0.5MPa (the original instantaneous closure gave 2.0MPa); too fast a closure causes the hammer, and verifying the time keeps it controlled;
3) Add an air cushion buffer vessel (2m3 volume, precharge 0.4MPa); an abrupt change with no cushion is absorbed by the vessel, so the peak is shaved;
4) Provide two-stage closure at the pump discharge (fast first, then slow); a hard closure cracks the pipe and staged closure softens it, protecting the pipe;
5) Carry out a water hammer test (measured peak <=0.9MPa); the hammer was never calculated and measurement confirms it is controlled, so the data fixes the surge;
6) Fit a water hammer pressure recorder (monitor the peak); the hammer shows up first as a pressure peak and early detection gives warning, monitoring the surge;
7) Control the shutdown method in operation (throttle down first, then stop); an abrupt stop causes the hammer and controlling the sequence softens it, preventing surges in operation;
8) Write the slow closing and the hammer calculation into the calculation sheet; the root cause of the shutdown water hammer was the absence of slow closing and the missing calculation, so the calculation sheet closes the loop.

Checklist

References

GB/T 20801.3-2020 Design Code for Industrial Metallic Piping