E44-1043 · Water Hammer and Pressure Surge · Condensate Pipe · ★★★
Condensate hammer, vibration, cracking
[Mechanism] Condensate was not fully drained from the steam line; high-velocity steam pushes a water slug that strikes the elbow and generates water hammer.
[Calculation] DN150 steam pipe, 50L of accumulated water; steam at v=30m/s drives the water slug; impact ΔP=2.5MPa; elbow stress exceeded three times the allowable and the pipe has cracked.
[Design Omission] No steam trap was provided, drain spacing was not checked, and condensate was not drained.
1) Add more steam traps (spacing 30m instead of 80m); long runs let condensate collect, so closer spacing drains it and prevents pooling;
2) Check trap spacing so low points hold no water (≤30m); pooling causes hammer, and correct spacing drains it, suppressing hammer;
3) Provide startup condensate drain (warm-up line drained first); pooling causes hammer, and draining eliminates it, preventing hammer on startup;
4) Add a slow-closing valve (8s closure); sudden closure causes hammer, and slow closure cuts it, protecting the pipe;
5) Run a water-hammer test (measured ΔP≤0.9MPa); the hammer was never calculated, so measured data confirms it is controlled, sizing the hammer by data;
6) Install pipeline vibration monitoring (to watch impacts); hammer first shows up as vibration, so early warning gives advance notice;
7) Control the warm-up rate in operation (slow heating to drain condensate); rapid thermal swings form slugs, so controlled heating drains them and prevents hammer in service;
8) Write trap spacing check into the calculation report; the root cause of condensate hammer is undrained condensate over long runs, so calculations gate it.
GB/T 20801.3-2020 Design code for industrial metallic piping