Pipe High-Point Water Hammer

E44-1042 · Water Hammer and Pressure Surge · Pipe High Point · ★★

Problem Description

High-point hammer, vibration, and cracking.

Root Cause

[Mechanism] Air accumulates at the pipe high point to form an air column; on pump shutdown, the air column compresses and releases, triggering water hammer, and venting was poor.
[Calculation] High-point elevation +12m, trapped air column 8m long; on shutdown the compressed air column generates ΔP=1.2MPa, causing high-point vibration and loosened joints.
[Design Omission] No high-point vent, no slope-direction check, and no air-column water-hammer calculation.

Corrective Solution

1) Fit an automatic air vent at the high point (DN25, continuous venting); the air column caused the hammer, and venting removes it, so reduce the hammer;
2) Check the line slope direction (downhill in flow direction; no reverse slope trapping air); reverse slope traps air and causes hammer, and a checked slope vents it, so keep the line free of air columns;
3) Add a slow-closing valve (8s closure); abrupt closure caused the hammer, and slow closure cuts it, so protect the pipe;
4) Fit a drain at the high point (vent during maintenance); trapped water caused the hammer, and draining removes it, so vent the air;
5) Run a water-hammer test (measured high-point ΔP≤0.8MPa); the air hammer had never been calculated, and the measurement confirms control, so set the peak by data;
6) Fit high-point pressure and vibration monitoring (watch the peak); the hammer first shows as vibration, so monitor and give early warning;
7) Keep the pipe full in operation (no air at the high point); the air column caused the hammer, and a full line stays stable, so prevent hammer in operation;
8) Write venting and slope check into the calculation report; the root cause of the high-point hammer was no vent and reversed slope, so lock it in at calculation level.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping