E44-405 · Two-Phase Flow and Air Binding · Process Pipe High-Point Air Accumulation · ★★
An air plug at the high point shrank the flow area by 40%, cutting flow by 35% and leaving downstream process feed insufficient.
[Mechanism] Air accumulates at the high point, occupying the section and shrinking the flow passage.
[Flow Reduction] The 40% area shrink cut flow by 35%.
[Design Omission] No high-point vent and no sloped layout — air-plug binding.
1) Fit an automatic vent at the high point to bleed all gas; accumulated gas occupied 40% of the section, cut flow 35% and starved the process, so vent to preserve the flow area;
2) Lay the pipe on a slope so air rises, since flat lines trap air, sloping the layout;
3) Add an air collector for centralized venting, since dispersed air is hard to vent, collecting air;
4) Include the air-binding loss in the total resistance, since air binding causes loss, accounting for it fully;
5) Monitor downstream flow to detect the drop early; the plug caused the reduction, so watch the flow;
6) Keep air out of the pump suction; gas causes damage, so prevent it;
7) Manually vent periodically; the vent valve can fail, so bleed by hand;
8) Write venting into the design, since the missing vent was the root cause, closing the loop at design.
GB/T 5657-2013 Technical specifications for centrifugal pumps