E44-441 · Two-Phase Flow and Gas Binding · Gas Line End Use · ★★
Intermittent end-use demand compresses and releases gas in the line, sending pressure waves ±0.05MPa and making instruments mis-operate.
[Mechanism] Because gas is compressible, it stores energy and sends pressure waves.
[Calculation] The ±0.05MPa wave makes instruments mis-operate.
[Design Omission] No air receiver and no pressure stabilization were provided — the cause of the compression-driven fluctuation.
1) Fit an air receiver at the end to hold pressure; compressibility stores energy and sends ±0.05 waves with mis-operation, so the tank stabilizes it;
2) Enlarge the pipe diameter to slow the wave speed; small piping propagates waves fast, so upsize it;
3) Fit a pressure-regulating valve at the point of use; fluctuations propagate, so hold the pressure steady;
4) Stagger demand across branches; simultaneous use causes waves, so offset the peaks;
5) Add damping ahead of instruments; waves cause error, so damp them;
6) Check the gas response; compressibility adds lag, so verify it;
7) Periodically measure pressure waves; they are hidden, so measure them;
8) Write buffering into the design; the original lack of stabilization was the root cause of the waves, so gate it at design stage.