E44-447 · Two-Phase Flow and Gas Binding · Gas in Flushing Line · ★★
Gas in the flushing line made the flush flow pulsate, dirt accumulated in dead legs that could not be washed out, and hygienic requirements were not met.
[Gas Entrainment] Gas made the flush flow pulsate and dirt collected in dead legs.
[Incomplete Flush] Dirt in the dead legs could not be washed out, and the requirement was not met.
[Design Omission] No venting of flushing gas and no flow stabilization; gas binding left the flush incomplete.
1) Provide venting and pressure stabilization on the flush line; gas caused pulsation, dead-leg dirt, and non-compliance, so venting and stabilized pressure give a clean flush;
2) Place flush outlets to reach the dead legs; dead legs are hard to flush, so outlets are placed there;
3) Control the gas fraction; more gas means more pulsation, so control gas;
4) Provide flush-pressure monitoring; pressure pulsation degrades the flush, so monitor pressure;
5) Periodically inspect dead legs; hidden dirt lingers there, so inspect the corners;
6) Stabilize the flush-pump flow; pulsation causes poor flushing, so stabilize flow;
7) Slope the line downward to aid drainage; dirt pools otherwise, so slope it accordingly;
8) Write venting into the design; gas entrainment was the root cause of the poor flush, so the design gates it.
GB/T 5657-2013 Technical specifications for centrifugal pumps