MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Fluid Systems Error Case › Gas Ingress into the Liquid Line

Gas Ingress into the Liquid Line

E44-1051 · Two-Phase Flow and Air Binding · Liquid Line · ★★

Problem Description

Gas ingress, air binding, flow cutoff

Root Cause

[Mechanism] Air leaks in at high points or joints of the liquid line, forming an air lock that reduces downstream flow and can even cause complete flow cutoff.
\n[Calculation] DN150 liquid line, 2 air-ingress points, void fraction rising to 8%, downstream Q dropping from 80 to 45m³/h, pump cavitation.
\n[Design Omission] No gas isolation, no high-point venting, and no liquid seal provided.

Corrective Solution

1) Reweld the leak points and perform leak-tightness testing (eliminate ingress); since air ingress causes the lock, sealing the leaks restores pure liquid flow, restoring flow;
\n2) Install vent valves at high points (DN20 continuous venting); since air binding causes the cutoff, venting restores passage, restoring flow;
\n3) Provide a U-shaped liquid seal (0.5m elevation difference); since gas ingress causes the blockage, the liquid seal isolates the air, giving gas isolation;
\n4) Raise and stabilize the liquid level (suction sump ≥0.6m); since a low level invites air ingestion, raising the level stabilizes the inlet, suppressing ingestion;
\n5) Run a flow-through test (measured Q≥80m³/h); since the blockage was never verified, measured flow confirms passage, so flow is confirmed by data;
\n6) Install void-fraction monitoring (void fraction ≤1%); since ingestion first appears as gas, early detection gives warning, so gas is monitored and alerted;
\n7) Control joint sealing in operation (no leaks); since leaks cause ingress, controlling seals keeps the system stable, preventing ingestion in operation;
\n8) Write gas isolation and the liquid seal into the calculation sheet; since the root cause of gas bypass is unsealed leaks and unvented high points, the calculation stage provides the check.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL