E44-176 · Filter Clogging and Contamination · Process Y-Strainer · ★★
No bypass was provided, so cleaning the blockage required stopping the pump; each shutdown lasted 2h, occurring 4 times per month.
[No bypass] Cleaning the blockage necessarily stops the pump.
[Production loss] Stopping the pump to clean costs production time.
[Design Omission] No strainer with bypass and no duplex unit were provided, causing shutdown.
1) Switch to a strainer with bypass / duplex unit for online cleaning, because without a bypass the pump must be stopped 4 times a month, thereby cleaning online without shutdown;
2) Use a duplex pair, one in service and one standby, switching to clean, because a single unit must stop, thereby switching to the standby;
3) Provide a Δp alarm to detect blockage early, because clogging builds progressively, thereby alarming early;
4) Choose a quick-opening, easy-to-remove screen, because slow removal prolongs shutdown, thereby using quick-opening;
5) Standardize the cleaning procedure to shorten it, because ad-hoc operations are slow, thereby standardizing;
6) Keep spare screens in adequate stock, because replacement needs parts, thereby stocking spares;
7) On the trial run, verify online cleaning without production loss, because design requirements must be measured, thereby confirming delivery;
8) Include the bypass in the strainer layout, because the original lack of bypass is the root cause of shutdown, thereby making it mandatory in layout.
GB/T 3766-2015 Hydraulic fluid power - General technical conditions