Lubricating-Oil Element Overdue and Plugged Solid

E44-456 · Filter Clogging and Contamination · Lubricating-Oil Element 10μm · ★★★

Problem Description

The element ran 8000h without replacement and saturated with dirt; Δp=0.35MPa exceeded the 0.2 alarm value, the bypass valve opened, and the solid content of the oil rose 5×.

Root Cause

[Mechanism] Once dirt-holding capacity is reached, the media plugs solid and Δp spikes.
[Calculation] Dirt load M=∫cQdt; over 8000h M=120g > the 80g capacity, and Δp=0.35MPa triggers the bypass.
[Design Omission] No replacement interval was set and no Δp trend management existed; overdue operation let the bypass pass dirty oil.

Corrective Solution

1) Set the replacement interval to 4000h based on the 80g capacity, because the original 8000h exceeded capacity, pushed Δp to 0.35 and opened the bypass, thereby replacing on schedule to prevent bypass;
2) Fit a Δp indicator at 0.2MPa to mandate replacement, because there was no reminder and the element ran overdue, thereby replacing on cue;
3) Set the bypass valve at 0.25MPa and keep it closed until element change, because opening it feeds dirty oil directly, thereby controlling the bypass;
4) Periodically test oil samples for solid content, because a 5× rise indicates clogging, thereby monitoring oil;
5) Build an element-change log with warnings, because relying on memory easily misses it, thereby reminding;
6) Select the next-larger-capacity element, because 80g capacity is tight, thereby leaving margin;
7) Flush the housing at the same time as element change, because old dirt remains, thereby cleaning the housing;
8) Write the replacement interval into the maintenance card, because the original lack of interval is the root cause of overdue operation, thereby enforcing maintenance control.

Checklist

Reference

GB/T 20080-2014 Hydraulic filter elements