ASU Heat Exchanger Ice Blockage

E44-542 · Heat Exchanger Fouling and Insufficient Heat Exchange · Aluminum ASU Heat Exchanger · ★★

Problem Description

Undried gas inlet, ice blockage, abnormal switching

Root Cause

[Mechanism] Moisture-laden gas freezes and seals the passages.
[Calculation] A dew point >-60℃ causes water to freeze and seal the holes, block passages, and disrupt switching.
[Design Omission] Deep drying and switching-cycle tuning were not done, so ice blockage occurred.

Corrective Solution

1) Deep-dry the feed gas (dew point <-60℃) to prevent icing; because moisture-laden gas freezes at -60℃, sealing holes, blocking passages and disrupting switching, deep drying removes moisture and prevents ice sealing;
2) Tune the switching cycle (dynamically adjust by dew point / differential pressure); because ice buildup narrows channels and the cycle must be shortened to prevent full blockage, tuning preserves switching;
3) Add a differential-pressure alarm (alarm at Δp > design +20%); because ice blockage raises differential pressure before switching anomalies appear, it gives early warning;
4) Add an inlet heater (electric heat tracing at the inlet); because cold gas freezes and seals passages while heating raises wall temperature and prevents icing, heat tracing provides freeze protection;
5) Schedule ice-melt inspection (defrost each shift / check for sealed holes); because ice thickens and hole sealing worsens, periodic melting restores channels;
6) Regenerate molecular sieves on schedule (regenerate every 4-8h, monitor outlet dew point); because saturated sieves lose moisture capacity and the gas stays wet, scheduled regeneration keeps the gas dry;
7) Monitor outlet dew point (alarm at dew point >-60℃); because the dew point rises before icing and gives early warning, dew-point monitoring prevents icing;
8) Write deep drying and switching cycles into the ASU heat exchange procedure; because the original design omitted deep drying and cycle tuning, the root cause of ice blockage, the procedure closes the loop.

Checklist

Reference

GB/T 151-2014 Heat exchangers