E44-719 · Hydraulic System Contamination and Crawling · Maintenance Assembly · ★★
Unclean assembly, contamination ingress
[Mechanism] Unclean assembly lets contamination in.
[Calculation] Unclean assembly causes contamination.
[Design Omission] No cleanliness, no sealing, and no inspection - a design defect leaving the assembly dirty.
1) Assemble on a clean bench against contamination (Class 10,000, dust-free); the original dirty assembly let dust fall to >NAS11, and contamination entered and jammed the valve, so clean-bench assembly prevents it;
2) Seal open ports against falling dust (temporary covers, plastic wrap); exposed ports get contaminated, so sealing keeps dust out;
3) Clean parts before assembly (wash + blow out, no particles); dirty parts contaminate the oil, so cleaning removes the source;
4) Use dedicated cleaning wipes (lint-free); mixed-use wipes leave lint and contaminate, so dedicated wipes keep things clean;
5) Check assembly cleanliness (wipe with a white cloth, no trace); suspected contamination is caught by the wipe check, giving quality control;
6) Filter the oil before startup (to NAS 8); contaminated oil jams the valve, so filtering before start keeps it clean;
7) Renew the oil to preserve cleanliness (filtered new oil for refill); maintenance work contaminates the oil, so changing it keeps it clean;
8) Write cleanliness and port sealing into the maintenance card (cleanliness tag); since lack of cleanliness was the root cause, fixing it in the maintenance card gives maintenance oversight.
GB/T 3766-2015 General technical conditions for hydraulic systems