Flow Totalization Error

E44-758 · Uneven Flow Distribution · Flow Totalization · ★★

Problem Description

Totalized deviation >2%, inconsistent with tank volume

Root Cause

[Mechanism] The totalizer pulse factor is wrong or the totalizer was not cleared.
[Calculation] A 1% error in the factor biases the totalization by 10t per 1000t, and failing to clear the totalizer stacks the old value on top.
[Design Omission] The pulse factor was not verified and the totalizer was not cleared, so the totalization was wrong.

Corrective Solution

1) Verify the totalizer pulse equivalent (recompute from the nameplate K factor to within ≤0.5%), because the wrong factor biased the volume each pulse represents and the totalization by 10t per 1000t, thereby restoring accuracy by re-verifying the equivalent;
2) Clear the totalizer before each batch to prevent stacking (clear it and record the initial value), because not clearing it stacked the previous batch's remainder on top and inflated the total, thereby removing the stacking by clearing;
3) Verify the flow coefficient (calibrate against actual flow and correct at ≥3 points), because the uncalibrated coefficient biased the whole range and the error accumulated in the total, thereby correcting the points by calibration;
4) Compare against a reference sample (compare with a standard tank to ±0.5%), because the omitted comparison left a hidden bias and a long-term error, thereby proving accuracy by the reference sample;
5) Monitor the totalized state (display the total alongside the instantaneous value, alarm on a step change), because gradual drift biases the total slowly and diverges badly over time, thereby monitoring the change;
6) Standardize the meter model (use one coefficient library per line), because mixing coefficients across different meter models mis-totalized the flow, thereby preventing the mix by standardization;
7) Periodically check the totalization (compare it with the tank volume after each batch), because gradual bias is invisible and shows only at the batch end, thereby closing the loop by batch checking;
8) Write the pulse verification and clearing into the maintenance card, because the omitted verification was the root cause of the error, thereby keeping the totalization trustworthy.

Checklist

Reference

GB/T 2624.1-2006 Flow measurement

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL