E44-632 · Level Control Failure · Equalizing line · ★★
Blocked, offset, reading frozen
[Mechanism] A blocked equalizing line offsets the pressure.
[Calculation] The blockage offsets the reading.
[Design Omission] The line was not purged, not cleared and not inspected — so it blocked.
1) Purge the equalizing line clear (continuous instrument-air purge at 0.1MPa): because the original equalizing line (Φ10) was blocked by condensed medium and the pressure transmission was interrupted, offsetting the reading (e.g. 0.3m off), purging keeps it clear so the line is open and the reading accurate again;
2) Provide back-purge against blockage (constant back-purge flow 0.3Nm³/h): because dirt blocks it and back-purge clears it, blockage is prevented;
3) Add a drain connection to clear blockages (drain every shift): because buildup blocks it and draining clears it, the line is maintained;
4) Choose a larger-diameter line (Φ10 to Φ15): because a small bore blocks and a larger bore reduces deposit, blockage is reduced;
5) Trace-heat against condensate blockage (≥80℃): because condensation blocks it and tracing prevents it, condensation is avoided;
6) Calibrate the zero (compare with the local gauge): because an offset requires calibration and calibration corrects it, the true value is confirmed;
7) Check for blockage periodically (clear the line weekly): because blockage is gradual and checking gives early warning, the offset is prevented;
8) Write the purging and line clearing into the maintenance card: the original lack of purging was the root cause of the blockage, so the card locks it in and maintenance governs it.