E44-641 · Level Control Failure · Low-level interlock · ★★★
Did not act, pump ran dry
[Mechanism] The low-level interlock fails to act and the pump runs dry.
[Calculation] The failure to act runs it dry.
[Design Omission] The interlock was not verified, not tested and not inspected — so it failed.
1) Verify the low-level interlock trip point (calibrate to the setpoint ±1mm): because the original interlock failed to act and the pump drew dry and cavitated at a low level (≤5%), verifying the point ensures it trips so the pump stops at a low level;
2) Run an interlock test (simulate a low level monthly): because without a test the failure is unverified and the test proves it, it is confirmed;
3) Check the circuit against breaks (signal circuit insulation ≥20MΩ): because a break loses the signal and checking the circuit restores it, it does not break;
4) Add dry-run protection (a vibration switch trips the pump): because running dry damages it and the protection stops it, the pump is protected;
5) Verify the measured value against the interlock (compare the measured value with the interlock setting): because a deviation causes the failure and comparison verifies it, the interlock is accurate;
6) Check the interlock condition (review the interlock records weekly): because gradual failure runs it dry and checking gives early warning, dry running is prevented;
7) Provide two-channel redundancy (two transmitters voting): because a single channel can fail and redundancy protects, no error occurs;
8) Write the interlock verification and testing into the control card: the original lack of verification was the root cause of the failure, so the card locks it in and control governs it.
GB/T 17214 Industrial-process measurement and control