E44-646 · Level Control Failure · Redundant measuring points · ★★★
Redundancy lost, misjudgment
[Mechanism] Losing the redundancy causes a misjudgment.
[Calculation] The loss causes the error.
[Design Omission] The redundancy was not verified, not switched and not inspected — so it was lost.
1) Verify that the redundant measuring points agree (two-out-of-three voting, alarm at >1% deviation): because the original inaccurate redundant point misled the voting (e.g. two gauges 3% apart), verifying makes them agree so the criterion is reliable;
2) Provide voting logic (median-of-three or two-out-of-three): because a single failure misleads and voting drops the bad signal, no error occurs;
3) Run a redundancy changeover test (simulate a single-point failure monthly): because without a test the loss is unverified and the test proves it, changeover is confirmed;
4) Check each point's condition (inspect the three readings weekly): because gradual loss misleads and checking gives early warning, calibration is timely;
5) Add diagnostic alarms (alert when the deviation exceeds the limit): because a loss misleads and diagnostics catch it, it is corrected early;
6) Calibrate the zeros together (calibrate all three to the same standard): because a deviation misleads and one standard makes them accurate, they agree;
7) Inspect the redundancy periodically (quarterly): because gradual loss offsets it and periodic inspection steadies it, it is reliable;
8) Write the redundancy verification and voting into the control card: the original lack of verification was the root cause of the loss, so the card locks it in and control governs it.
GB/T 17214 Industrial-process measurement and control