E44-793 · Piping Supports and Thermal Expansion · Cold Spring · ★★
No cold spring, hot-state stress > allowable, loosening
[Mechanism] Without cold spring the initial hot-state stress is high.
[Calculation] The omitted cold spring drives the hot-state combined stress > the allowable and loosens the position.
[Design Omission] Neither cold spring nor re-tightening was provided — so cold spring must be applied.
1) Apply cold spring pre-tension (pre-deform 50% of the thermal displacement in the cold state): because the omitted cold spring drove the hot-state combined stress > the allowable and loosened the position, cold spring reduces the thermal stress;
2) Check the cold-spring amount (pre-tension = 0.5× thermal displacement): because a difference loosens and the check makes it accurate, the amount is checked;
3) Re-tighten in the hot state (re-tighten the bolts after heating to the working temperature): because loosening offsets and re-tightening corrects it, re-tightening stabilizes the position;
4) Mark the cold spring (mark the cold-state position to prevent error): because without it the deviation is blind and the mark reveals it, it is marked;
5) Monitor the loosening (displacement-mark monitoring, alarm at offset >3mm): because progressive loosening raises the stress and early awareness helps, loosening is monitored;
6) Perform a cold-hot test (heat and cool while recording the displacement curve): because the original lack of testing left the loosening undiscovered, the test identifies the stress points, so the states are tested;
7) Control the temperature ramp (heat / cool ≤30℃/h): because a rapid change loosens and a slow one keeps it under control, the ramp is controlled;
8) Write the cold spring and re-tightening into the assembly card: the original lack of cold spring was the root cause of the loosening, so assembly controls the work and the stress is acceptable.
GB/T 20801.3-2020 Design code for industrial metallic piping