Knowledge Base › Fluid Systems Error Case › Multiple Thermal Displacements Superpose Off-Center

Multiple Thermal Displacements Superpose Off-Center

E44-805 · Piping Supports and Thermal Expansion · Multiple Thermal Displacements · ★★

Problem Description

Multi-directional displacement superposed, off-center >8mm, rub and jamming

Root Cause

[Mechanism] The vectors of multiple pipes' thermal displacements superpose and cause offset.
[Calculation] The superposition drives the resultant displacement off-center >8mm and rubs and jams it against the adjacent pipe.
[Design Omission] The superposition was neither calculated nor pre-offset — so it must be calculated.

Corrective Solution

1) Calculate the superposed displacement and pre-offset it (vector-sum the displacement at each point and pre-offset the installation): because the original failure to calculate the superposition drove the resultant off-center >8mm and rubbed and jammed the adjacent pipe, the installation is pre-offset;
2) Check the displacement at each point (verify each pipe's displacement vector): because an error rubs and the check corrects it, the displacement is checked;
3) Leave a pre-offset amount (pre-offset in the cold state per the resultant vector): because without it jamming occurs and the allowance keeps it free, the allowance is left;
4) Provide guides to limit the offset (guides keep it coaxial): because offset rubs and guides correct it, guides are provided;
5) Monitor the offset condition (displacement-mark monitoring, alarm at offset >5mm): because a progressive offset worsens the rub and early awareness helps, the offset is monitored;
6) Perform a hot test (raise the temperature and record the resultant displacement at each point): because the original lack of testing left the offset undiscovered, the test reveals the true displacement, so the hot test is run;
7) Control the temperature ramp rate (≤30℃/h): because a rapid change offsets and a slow one keeps it under control, the ramp rate is controlled;
8) Write the displacement calculation and pre-offset into the calculation sheet: the original design omission was the root cause of the superposition, so calculation controls the design and no rub or jamming occurs.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping