E44-809 · Piping Supports and Thermal Expansion · Thrust-Restraint Pier · ★★★
Pier concrete cracked, pipe shifted, failure
[Mechanism] Insufficient pier reinforcement / concrete cracking causes loss of thrust capacity.
[Calculation] Cracking drops the thrust capacity >40% and the pipe shifts.
[Design Omission] Neither reinforcement nor proper casting was provided — so reinforcement must be added.
1) Add reinforcement to secure the pier (reinforcement ratio ≥0.2%, two-way bars): because the original cracking dropped the thrust capacity >40% and shifted the pipe, reinforcement carries the thrust;
2) Check the pier capacity (design for ≥1.5 times the blind-flange force + thermal thrust): because a weak pier cracks and the check ensures adequacy, the capacity is checked;
3) Re-cast the concrete (grade ≥C30, well vibrated and compacted): because cracking shifts the pipe and re-casting secures it, the concrete is re-cast;
4) Weld the anchorage (weld the anchor plate firmly to the pipe): because looseness shifts and welding secures it, it is welded;
5) Inspect cracking (tap-check / measure the width, alarm at crack >0.2mm): because progressive cracking loses the thrust and early awareness helps, cracking is inspected;
6) Perform a thrust test (pressurize and record the pier displacement): because the original lack of testing left the cracking undiscovered, the test reveals the bearing capacity, so thrust is tested;
7) Control the thrust ramp (pressurize ≤0.1MPa/s): because a rapid change cracks and a slow one keeps it under control, the thrust is controlled;
8) Write the reinforcement and re-casting into the assembly card: the original lack of reinforcement was the root cause of the cracking, so assembly controls the work and the pier does not crack.
GB/T 17116.1-2018 Pipe supports and hangers