E44-819 · Piping Supports and Thermal Expansion · Water Hammer · ★★★
Water hammer, supports knocked loose, falling off
[Mechanism] The instantaneous pressure of water hammer knocks the supports loose.
[Calculation] A water-hammer Δp >0.5MPa shocks the supports and knocks them loose.
[Design Omission] Neither cushioning nor securing was provided — so cushioning must be added.
1) Open the valve slowly to prevent water hammer (valve opening ≤5%/s): because the original water-hammer Δp >0.5MPa shocked the supports and knocked them loose, slow opening reduces the hammer;
2) Secure the supports to prevent release (weld the anchorage firmly + add clamps): because the hammer drops them and securing holds them, the supports are secured;
3) Add a relief valve (relieve when 1.1 times the set pressure is exceeded): because the hammer strikes and relief lowers it, pressure is relieved;
4) Weld the anchorage firmly (weld the anchor plate on both sides): because looseness releases it and welding secures it, the weld is made;
5) Monitor the release condition (displacement / visual monitoring, alarm on looseness): because progressive release brings drop-off closer and early awareness helps, release is monitored;
6) Perform a hydrostatic test (pressurize and record the support displacement): because the original lack of testing left the hammer undiscovered, the test reveals the loads, so the test is run;
7) Control the rate of change (pump ramp ≤10%/s): because abrupt changes cause hammer and limiting the rate relieves it, the rate is limited;
8) Write the slow opening and support securing into the operation card: the original lack of cushioning was the root cause of the hammer, so operations control the work and the supports stay firm.
GB/T 20801.3-2020 Design code for industrial metallic piping