E44-833 · Piping Supports and Thermal Expansion · Offset Installation · ★★
No pre-offset, displacement offset >5mm, rub and jamming
[Mechanism] Without offset installation, the pipe deviates in the hot state and jams by wear.
[Calculation] Without offset installation, the displacement deviates >5mm and wears adjacent parts.
[Design Omission] The displacement was neither calculated nor pre-offset — so it must be calculated.
1) Calculate the displacement and offset the installation (pre-offset by the displacement vector at each point): because the original lack of offset let the displacement deviate >5mm and wear adjacent parts, the installation is pre-offset;
2) Check the offset amount (cold pre-offset = hot displacement vector): because a mismatch causes wear and the check ensures accuracy, the amount is checked;
3) Mark the offset direction (mark the pre-offset direction to prevent reversal): because guesswork leads to error and marking makes it clear, the direction is marked;
4) Use guides to limit deviation (install guides to keep alignment): because deviation jams and guides correct it, the guides are used;
5) Monitor the offset condition (displacement-mark monitoring, alarm at offset >3mm): because a progressive offset worsens the rub and early awareness helps, the offset is monitored;
6) Perform a hot test (raise the temperature and record the actual displacement): because the original lack of testing left the deviation undiscovered, the test reveals the true displacement, so the hot test is run;
7) Control the temperature ramp rate (≤30℃/h): because a rapid change offsets and a slow one keeps it under control, the ramp rate is controlled;
8) Write the calculated amount and direction marking into the assembly card: the original design omission was the root cause of the deviation, so assembly controls the work and no wear or jamming occurs.
GB/T 20801.3-2020 Design code for industrial metallic piping