E44-835 · Piping Supports and Thermal Expansion · Thrust-Restraint Pier · ★★★
Thrust-restraint pier failure, pipe displacement, equipment pushed
[Mechanism] Failure of the thrust-restraint pier lets the pipe shift.
[Calculation] The failed restraint allows displacement >15mm and pushes the equipment nozzle.
[Design Omission] Neither securing nor a force check was provided — so it must be secured.
1) Re-secure the thrust-restraint pier (reinforced-concrete pier + anchoring): because the original failure allowed displacement >15mm and pushed the equipment nozzle, the restraint is secured and the pipe is stabilized;
2) Check the thrust capacity (design for ≥1.5 times the blind-flange force + thermal thrust): because a weak pier shifts and the check ensures adequacy, the capacity is checked;
3) Add reinforcement (reinforcement ratio ≥0.2%): because cracking leads to shifting and reinforcement stabilizes it, the reinforcement is added;
4) Weld the anchorage (weld the anchor plate firmly): because looseness leads to shifting and welding secures it, the weld is made;
5) Monitor the restraint condition (displacement marks, alarm >5mm): because progressive failure cracks the equipment nozzle and early awareness helps, the thrust is monitored;
6) Perform a thrust test (pressurize and record the displacement): because the original lack of testing left the failure undiscovered, the test reveals the load capacity, so the thrust test is run;
7) Control the thermal displacement (provide compensation on the adjacent section to absorb the thrust): because expansion pushes and compensation relieves it, the displacement is controlled;
8) Write the pier securing and reinforcement into the assembly card: the original lack of securing was the root cause of the thrust, so assembly controls the work and the thrust restraint stays firm.
GB/T 17116.1-2018 Pipe supports and hangers